Skip to content
BidFabricate
Steel and concrete building under construction at dusk
Construction procurement, built for progress

Build better. Source smarter.

The Philippines’ first construction procurement marketplace. Connect with verified fabricators and PCAB-licensed contractors.

  • Verified professionals

    DTI-registered fabricators, PCAB-licensed contractors

  • Sealed bidding

    No bid is visible to anyone else before the deadline

  • Milestone contracts

    Escrow-held funds released as milestones are delivered

  • Revision control

    Every bid stays tied to the drawing it was priced from

For a stronger tomorrow

Built for three sides of the same job.

Different roles, one record. A more transparent and competitive construction supply chain in the Philippines.

01 For buyers

Find the right partners, faster.

Post your requirement once, reach qualified suppliers, and get competitive bids. Nothing is visible to a rival before you decide.

  • Post fabrication RFQs and construction projects
  • Attach drawings, specs and revisions
  • Compare sealed bids side by side
  • Award into a milestone contract with escrow
Construction professionals reviewing plans on site
02 For fabricators

Showcase your capabilities.

Get discovered by buyers who can already see the drawings, and sell stock parts between jobs.

  • Bid on open RFQs
  • List stock parts in the shop
  • Track leads in a built-in CRM
03 For contractors

Win more opportunities.

PCAB-gated project bidding, so you compete against licensed peers rather than everyone.

  • Bid on construction projects
  • Milestone contracts and escrow
  • Verified licence on your profile
How it works

From a drawing to a signed milestone contract.

One sequence for stock parts, fabrication and construction. The same record follows the job from the first upload to the last release of funds.

  1. Post a requirement

    Describe the RFQ or project, set a budget range, and set the deadline for bids.

  2. Share documents

    Attach drawings and specifications. Revisions are tracked against every bid.

  3. Receive sealed bids

    Only DTI-registered fabricators and PCAB-licensed contractors can bid.

  4. Compare proposals

    Price, lead time and supplier profile in one view, not across an inbox.

  5. Award the work

    Awarding generates a milestone contract from the winning bid.

  6. Manage the transaction

    Escrow releases as milestones land. Messages and disputes stay on one record.

Live on the platform

Real opportunities. Real businesses.

Sign in to bid, attach files, or place an order.

Open fabrication RFQs

Browse all RFQs

No open RFQs at the moment.

Recent bids

Anonymised
  • A fabricator placed a bid
    on “[DEMO] 50pc steel mounting brackets, 5mm thick, powder-coated”
    5 months ago
  • A fabricator placed a bid
    on “[DEMO] 50pc steel mounting brackets, 5mm thick, powder-coated”
    5 months ago
  • A fabricator placed a bid
    on “[DEMO] CNC aluminum enclosures, 200pc, anodized black”
    5 months ago
  • A contractor placed a bid
    on “[DEMO] Warehouse extension, Pasig — 200 sqm”
    5 months ago
  • A contractor placed a bid
    on “[DEMO] Warehouse extension, Pasig — 200 sqm”
    5 months ago
  • A contractor placed a bid
    on “[DEMO] Warehouse extension, Pasig — 200 sqm”
    5 months ago
  • A contractor placed a bid
    on “[DEMO] G+1 office building, Quezon City — 800 sqm”
    5 months ago
  • A contractor placed a bid
    on “[DEMO] G+1 office building, Quezon City — 800 sqm”
    5 months ago

Construction projects

Browse all projects

No open construction projects.

Trust & security

Procurement records that survive a disagreement.

From the first drawing to the last release of funds, the platform keeps the trail that decides who was right.

01

Structured bidding

Bids stay sealed until the deadline passes or the buyer closes the posting, then they are compared in one view rather than reconstructed from an inbox.

02

Technical documents

Drawings and specifications are versioned, so a bid is always tied to the revision it was priced from. Access can be gated behind an NDA.

03

Contract workflow

An awarded bid becomes a milestone contract. Funds sit in escrow and release as milestones are delivered, with mediation if one is contested.

04

Verified professionals

Fabricators register with DTI details and contractors with a PCAB licence. Classification gates which projects a contractor may bid on at all.

Construction professionals overlooking an active building site at sunset
Same industry, a brighter tomorrow

Ready to source smarter?

Set up an account, post your first requirement, and see what verified suppliers come back with.

Questions first? hello@bidfabricate.com